中文字幕1级精品视频在线,日韩经典亚洲一区二区三区,日本成人精品视频网站一区,国产区 日韩 欧美

    1. <track id="abu7z"><dl id="abu7z"></dl></track>
      1. <source id="abu7z"></source>

      2. <i id="abu7z"></i><source id="abu7z"><ins id="abu7z"></ins></source>

            Construction of rock-socketed piles for the third phase coal terminal of Jiaxing Power Plant

            In 2011, our company undertook the construction of rock-socketed piles for the coal terminal of Jiaxing Power Plant Phase III. The photo shows the construction scene of rock-socketed piles for the approach bridge of the wharf. Since the approach bridge is advancing from the front and back of the built coastal levee to the sea, the rock-socketed pile construction must overcome a large number of failures in the solid levee foundation and the slope protection area.