中文字幕1级精品视频在线,日韩经典亚洲一区二区三区,日本成人精品视频网站一区,国产区 日韩 欧美

    1. <track id="abu7z"><dl id="abu7z"></dl></track>
      1. <source id="abu7z"></source>

      2. <i id="abu7z"></i><source id="abu7z"><ins id="abu7z"></ins></source>

            Project

            查看更多

            Large-diameter rock-socketed pile construction

            Foundation pit retaining pile construction

            Construction of Large Diameter Inclined Rock-Socketed Pile

            Anchor rock pile construction

            The world's first rotary drilling rig to drive inclined pile construction

            Inclined pile construction

            Static pressure pile construction

            Occlusal post

            Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project

            From December 2012 to October 2013, our company cooperated with the Third Navigation Bureau of China Communications Administration to complete the construction of the rock-socketed piles of the non-navigable piers connecting the east artificial island of the Hong Kong-Zhuhai-Macao Bridge Island Tunnel Project in the direction of Hong Kong. This is all adopted by our company Another construction example of hydraulic rotary drilling rig.

            Construction base of -15# main bridge pier pile foundation of Chongqing Qianjiang Apenjiang Railway Extra Large Bridge

            In September 2015, our company undertook Chongqing Qianjiang Apeng River Railway Bridge from 0# to 19# piers (including 13# auxiliary piers, 14# and 15# main bridge piers, 16# auxiliary piers with a diameter of 2800mm, (L=65~98m rock-socketed piles included) All bridge pier pile foundation construction tasks) This is the 15# main pier construction scene.

            Construction site of rock-socketed piles for the wharf of Yangshan Port Phase IV Project

            On March 18, 2015, the rock-socketed piles (210 pieces) of the Yangshan Phase IV Wharf were drilled. As of October 5 of the same year, 76 pieces of φ2.3m and 126 pieces of φ2.5m were completed, and the remaining 8 independent mooring piers were Φ2. 0m rock-socketed pile is under construction.

            Construction scene of my country's first 3.4 MW tidal current power assembly platform

            In March 2016, our company undertook the construction of rock-socketed piles (including straight piles and inclined piles) of my country's first (the world's largest single-machine capacity) 3.4 MW "tidal power assembly platform" pile foundation (including straight piles and inclined piles) in China near Zhoushan-Xiushan Island. In this project, we overcome natural conditions such as rapids (-5m per second) and whirlpools, and successfully carried out accurate and correct construction on the weathered bare rock in the seabed.

            Shanghai International Shipping Center

            From 2002 to 2015, our company completed the construction of rock-socketed piles in the first, second, third and fourth phases of the Yangshan Port of Shanghai International Shipping Center in cooperation with the "China Communications Three Airlines" and "Shanghai Port Engineering". ?

            Baosteel Group Majishan Port Area 300,000 Tons Phase II Project

            In 2006, in the 300,000-ton wharf expansion project of the second phase of Baosteel Majishan Port, our company cooperated with the third voyage and the first voyage to complete the construction tasks of the unloading dock and the rock-socketed pile of the loading dock.

            Qinshan Nuclear Power Plant and its expansion project

            From 1998 to 2012, our company cooperated with China National Nuclear Corporation to participate in the construction of Qinshan Nuclear Power Station and its expansion project. The picture shows the use of RT-200AⅢ full-pipe hydraulic rotary drilling rig-the new technology completed the deep foundation pit enclosure of the Fangjiashan Nuclear Power Station in Qinshan Nuclear Power Station Deal with construction tasks.

            East Artificial Island of Hong Kong-Zhuhai-Macao Bridge

            This is the scene of our company's 5 rotary drilling rigs at the construction site of the non-navigable hole pier rock-socketed piles on the east artificial island of the Hong Kong-Zhuhai-Macao Bridge to the Lantau Island side of Hong Kong

            Construction site of the main bridge pier pile foundation of Chongqing Apenjiang Railway Bridge 14#

            The 14# main pier of Chongqing Apeng River Railway Bridge, like the 15# main pier, is a pile foundation construction group composed of 36 rock-socketed piles with a diameter of 2800mm and a length of 86~98m. Photo-On the hillside behind it is the 0#~13# pier pile foundation construction area, and in front of it is the beautiful "Apeng River"

            Construction scene of main pier 14# of Chongqing Qianjiang Apenjiang Railway Extra Large Bridge

            The 14# main pier of the Chongqing Qianjiang Apengjiang Railway Bridge. In this small construction area, our company invested one SR385 rotary excavator and 9 10-16 ton percussion drills to construct 36 piers with a diameter of 2800mm and a pile length of 86m~98m. Rock-socketed pile construction. In order to solve the construction of the super-long piles of the 14# and 15# main bridge piers, our company has adopted the combined construction technology of rotary excavator + percussion drilling rig after the demonstration of quality, safety and economy.

            Jiaxing China Coal Heavy Machinery Engineering Co., Ltd.

            Foundation and basic engineering and related technical services, mechanical and electrical equipment storage, leasing, maintenance


            Jiaxing China Coal Heavy Machinery Engineering Co., Ltd. "Abbreviation: China Coal Heavy Machinery" is a professional construction team mainly engaged in pile foundation construction. Founded in 1996, after more than 20 years of pile foundation construction practice, the company has accumulated rich construction experience and solid technology, and also trained a large number of engineers and skilled craftsmen.



            查看更多

            News Center


            News

            查看更多
            -
            2020/10/28

            Safety construction measures for digging and filling piles

               1 : Check the well for hazardous gases and unsafe factors before starting daily work. When the hole depth is greater than 10m and the humus soil la..
            -
            2020/10/28

            Safety construction measures for digging and filling piles

               1 : Check the well for hazardous gases and unsafe factors before starting daily work. When the hole depth is greater than 10m and the humus soil la..
            -
            2020/10/28

            Construction process of hammered sinking pipe cast-in-place pile

                 The mechanical equipment for hammering sunk pipe cast-in-place piles consists of pile pipe, pile hammer, pile frame, hoist pulley block and ..